澳门金莎娱乐网站-首页

Hubei Xiantao Domestic Waste Incineration Power Plant

澳门金莎娱乐网站

 Hubei Xiantao Domestic Waste Incineration Power Plant is located in Zhengrenkou Village, Ganhe Office, Xiantao City, Hubei Province, covering an area of 120 mu.

 The total designed daily waste treatment capacity is 1,000 t/d, with an annual waste treatment capacity of about 330,000 tons and an annual on-grid power capacity about 100 million kWh.

 The daily waste treatment capacity of Phase I is 500 t/d, and the total investment of Phase I is 250 million yuan. The main target is to build a 500 t/d inclined reciprocating reverse pushing grate incinerator and a 9 MW condensing steam turbine generator unit.

 The supporting construction is to build auxiliary diesel combustion devices, water supply and drainage systems and other auxiliary projects, as well as diesel storage tanks, ash storage, leachate collection and treatment system, flue gas cleaning system, fly ash treatment system and other storage and transportation and environmental protection projects.

 At present, the domestic wastes of Xiantao City and Xinchang Town, Zhanggou Town, Huchang Town, Changshang Town and other surrounding towns are accepted for achieving harmless, reduced and resource-based treatment.

澳门金莎娱乐网站|澳门金莎娱乐网站

XML 地图 | Sitemap 地图